BTC $77,350.64 +0.26%
ETH $2,513.98 -0.37%
BNB $722.08 -0.61%
XRP $1.36 -0.36%
SOL $101.38 -0.07%
TRX $0.3413 +0.41%
DOGE $0.0843 -0.59%
ADA $0.2088 +0.67%
BCH $224.89 -0.36%
LINK $11.44 -0.66%
HYPE $78.80 -1.09%
AAVE $126.75 +0.61%
SUI $0.7209 -0.37%
XLM $0.1805 +0.22%
ZEC $1,105.33 -1.75%
AAPL $330.73 -0.71%
AMZN $254.47 -0.88%
GOOGL $338.37 -0.82%
MSFT $491.99 -0.61%
META $644.78 -0.56%
NVDA $215.62 -1.23%
TSLA $362.70 -1.25%
SNDK $1,573.39 -3.13%
INTC $99.25 -2.75%
SPCX $149.26 -0.53%
MU $939.17 -2.91%
AMD $502.56 -2.60%
BTC $77,350.64 +0.26%
ETH $2,513.98 -0.37%
BNB $722.08 -0.61%
XRP $1.36 -0.36%
SOL $101.38 -0.07%
TRX $0.3413 +0.41%
DOGE $0.0843 -0.59%
ADA $0.2088 +0.67%
BCH $224.89 -0.36%
LINK $11.44 -0.66%
HYPE $78.80 -1.09%
AAVE $126.75 +0.61%
SUI $0.7209 -0.37%
XLM $0.1805 +0.22%
ZEC $1,105.33 -1.75%
AAPL $330.73 -0.71%
AMZN $254.47 -0.88%
GOOGL $338.37 -0.82%
MSFT $491.99 -0.61%
META $644.78 -0.56%
NVDA $215.62 -1.23%
TSLA $362.70 -1.25%
SNDK $1,573.39 -3.13%
INTC $99.25 -2.75%
SPCX $149.26 -0.53%
MU $939.17 -2.91%
AMD $502.56 -2.60%

cxmt

All
Article
Flash

first_img CXMT has launched the equipment bidding for the new factory in Shanghai and is planning to expand production in multiple locations

China's largest DRAM manufacturer Changxin Storage (CXMT) has recently launched a bidding for equipment from partners for its new factory in Shanghai and is advancing capacity expansion in multiple locations. CXMT is currently mass-producing DRAM in Hefei Phase II and Beijing Phase I, with an estimated capacity of about 200,000 wafers per month, which may exceed 300,000 wafers per month by the end of the year.CXMT plans to open the new factory in Shanghai in the fourth quarter of this year, and the related equipment bidding has already started. Semiconductor equipment industry insiders say that the factory is planned to be expanded in two phases, with capacity significantly exceeding 100,000 wafers per month. Subsequently, there are plans to open a new factory in Hefei in the first half of next year and the earliest new factory in Beijing in the second half of next year, with another new factory in Hefei opening in the first half of the year after next.Equipment industry insiders say that CXMT has communicated with multiple parties regarding the timing of building factories in various locations. If all plans are realized, CXMT could add at least 70,000 to 80,000 wafers of capacity per month each year from this year until 2028, with a long-term goal of exceeding 600,000 wafers per month. Samsung Electronics and SK Hynix's DRAM capacities are estimated at about 700,000 wafers and 600,000 wafers per month, respectively.

first_img Analysis: China's storage is divided among CXMT, YMTC, and XMC

Researcher Schulz_Research stated that China's storage advancement is no longer a story of a single company, but rather a division of labor among three companies: CXMT is responsible for DRAM wafers, YMTC is responsible for NAND and has added DRAM in its latest factory, and the foundry controlled by YMTC, XMC, is responsible for stacking products from both. This division corresponds to the rules set by Beijing since late December last year, which state that new factory approvals must show that at least half of the equipment is domestically sourced, with exemptions only granted when there are no domestic options available. YMTC's Wuhan Phase III is the first advanced storage project to pass this rule and is set to begin production later this year.CXMT operates three 300mm DRAM factories, each producing about 100,000 wafers per month; models indicate it will reach 350,000 wafers by the end of 2026, and if all announced projects are completed, the total will exceed 600,000 wafers. YMTC's first two factories in Wuhan have a combined capacity of 200,000 wafers, with Phase III expected to reach 50,000 wafers by 2027 and full production of 100,000 wafers, along with plans to build two more factories of similar scale. XMC has two 12-inch factories, each with about 30,000 wafers, and an HBM packaging line producing about 3,000 wafers per month. China supplies about 10% of the global DRAM bits, with YMTC accounting for 14% of NAND bit shipments in the second quarter, and China consumes about 30% of global storage.CXMT has begun mass production of DDR5 and LPDDR5 and plans to start mass production of HBM3 this year, having already sent samples to domestic AI hardware developers. XMC has spent two years building HBM packaging based on hybrid bonding and YMTC's stacking IP, and is still advancing TSV technology.

first_img Analysis: CXMT's production capacity has peaked, and DRAM prices continue to rise sharply

Analysis indicates that China's major DRAM manufacturer CXMT's monthly wafer output has reached a peak of approximately 240,000 pieces by the end of 2025, and is expected to remain flat in 2026. Due to the tightening of U.S. export controls on advanced semiconductor equipment, especially EUV lithography machines, its capacity for expansion is limited, and substantial expansion will not occur until at least 2027, depending on the progress of the domestic equipment supply chain. According to Goldman Sachs data, CXMT's coverage of domestic DRAM demand is only about 41% in 2026 and about 50% in 2028, reflecting a structural bottleneck for many years.TrendForce data shows that traditional DRAM contract prices are expected to surge by 90%-95% quarter-on-quarter in the first quarter of 2026, followed by another increase of 58%-63% in the second quarter. Jefferies predicts that prices will continue to rise by 40%-50% and 30%-40% in the third and fourth quarters, respectively. The price increase for server DRAM is even steeper, with Samsung and SK Hynix proposing price hikes of 60%-70% to clients like Microsoft and Google in the first quarter. S&P Global expects Samsung's traditional DRAM revenue per bit to rise by 116% year-on-year to $0.79 in 2026, while Micron's ASP will increase by 54% to $1.06; Bernstein predicts that SK Hynix's DRAM gross margin could reach 92.7% in the fourth quarter of 2026.Multiple forecasts suggest that effective supply relief may not occur until the end of 2027 or even 2028.

Changxin's long position funding fee is expected to yield an annualized return of 2130%, with whales able to net a profit of 740,000 USD in a single day

According to monitoring by Hyperinsight, the current hourly funding rate for Changxin has dropped to -0.2430%. A negative rate means that shorts pay longs; based on the current rate, the simple annualized return is approximately 2129%.Calculating with a position of $10,000, shorts need to pay about $24.3 per hour, while longs receive an equivalent income; if the rate is maintained for 24 hours, the corresponding funding fee is about $583.3.The largest long position starting with 0x9a8 is the main beneficiary of this round of negative rates. Records show that since the morning of July 15, it has completed 183 funding fee settlements for CXMT, with a cumulative net income of about $991,400, achieving a return rate of about 45.9% on the initial capital.This whale currently holds a leveraged long position of 1,633,200 CXMT at 5 times, with a position value of about $12,742,000 and an average entry price of $6.6156. CXMT is currently priced at $7.80, with an unrealized profit of about $1,938,000 (89.7%), and the liquidation price is only $0.507.Based on the current position and a static rate of -0.2430%, this whale can earn about $31,000 in funding fees in the next hour; if maintained for 24 hours, this corresponds to about $743,000.This whale currently still has 7 buy orders not labeled as "only reducing positions" between $6.01 and $6.41, planning to continue buying 98,000 CXMT, with a nominal amount of about $609,000, and has not chosen to cash out the existing long position.
app_icon
ChainCatcher Building the Web3 world with innovations.