BTC $77,732.36 +0.85%
ETH $2,520.14 +0.24%
BNB $723.92 +0.15%
XRP $1.39 +1.89%
SOL $101.41 +0.29%
TRX $0.3392 -0.22%
DOGE $0.0840 -0.26%
ADA $0.2094 +1.26%
BCH $222.13 -1.35%
LINK $11.38 -0.56%
HYPE $79.69 +1.34%
AAVE $125.98 -0.39%
SUI $0.7219 +0.40%
XLM $0.1840 +2.39%
ZEC $1,137.77 +0.20%
AAPL $329.98 -0.83%
AMZN $254.02 -0.85%
GOOGL $336.06 -0.95%
MSFT $494.17 0.00%
META $637.87 -1.34%
NVDA $213.99 -1.21%
TSLA $360.44 -1.63%
SNDK $1,552.08 -2.99%
INTC $97.96 -2.76%
SPCX $148.28 -1.13%
MU $933.62 -2.41%
AMD $493.20 -2.94%
BTC $77,732.36 +0.85%
ETH $2,520.14 +0.24%
BNB $723.92 +0.15%
XRP $1.39 +1.89%
SOL $101.41 +0.29%
TRX $0.3392 -0.22%
DOGE $0.0840 -0.26%
ADA $0.2094 +1.26%
BCH $222.13 -1.35%
LINK $11.38 -0.56%
HYPE $79.69 +1.34%
AAVE $125.98 -0.39%
SUI $0.7219 +0.40%
XLM $0.1840 +2.39%
ZEC $1,137.77 +0.20%
AAPL $329.98 -0.83%
AMZN $254.02 -0.85%
GOOGL $336.06 -0.95%
MSFT $494.17 0.00%
META $637.87 -1.34%
NVDA $213.99 -1.21%
TSLA $360.44 -1.63%
SNDK $1,552.08 -2.99%
INTC $97.96 -2.76%
SPCX $148.28 -1.13%
MU $933.62 -2.41%
AMD $493.20 -2.94%

product

All
Article
Flash

first_img CXMT has launched the equipment bidding for the new factory in Shanghai and is planning to expand production in multiple locations

China's largest DRAM manufacturer Changxin Storage (CXMT) has recently launched a bidding for equipment from partners for its new factory in Shanghai and is advancing capacity expansion in multiple locations. CXMT is currently mass-producing DRAM in Hefei Phase II and Beijing Phase I, with an estimated capacity of about 200,000 wafers per month, which may exceed 300,000 wafers per month by the end of the year.CXMT plans to open the new factory in Shanghai in the fourth quarter of this year, and the related equipment bidding has already started. Semiconductor equipment industry insiders say that the factory is planned to be expanded in two phases, with capacity significantly exceeding 100,000 wafers per month. Subsequently, there are plans to open a new factory in Hefei in the first half of next year and the earliest new factory in Beijing in the second half of next year, with another new factory in Hefei opening in the first half of the year after next.Equipment industry insiders say that CXMT has communicated with multiple parties regarding the timing of building factories in various locations. If all plans are realized, CXMT could add at least 70,000 to 80,000 wafers of capacity per month each year from this year until 2028, with a long-term goal of exceeding 600,000 wafers per month. Samsung Electronics and SK Hynix's DRAM capacities are estimated at about 700,000 wafers and 600,000 wafers per month, respectively.

first_img TSMC's 1.4 nanometer factory in the Central Science Park is accelerating fully, with mass production expected in the second half of next year

The Central Science Management Bureau confirmed on the 9th that TSMC's Central Science Phase II 1.4 nanometer factory expansion is fully accelerating. The first P1 factory has completed its steel structure and is expected to begin trial production in April next year, with mass production anticipated in the second half of next year, ahead of the originally scheduled mass production in 2028. TSMC has applied to the Central Science Management Bureau to set up two temporary offices at the site, which are expected to be completed in April next year, with the first batch of over 5,400 operational and outsourced personnel moving in.The advanced process new factory for TSMC's Central Science Phase II park broke ground last October, planning to build four 1.4 nanometer factories, with nearly 2,000 workers working day and night. The P1 factory is currently undergoing floor and exterior wall construction, with the factory building expected to be completed early next year. The P2 factory has begun basic construction and is scheduled to be completed in October next year, with both factories expected to start mass production successively next year. The P3 factory has obtained a construction permit, while the P4 factory is in the process of applying for a construction permit, planning to be built with a six-month gap. P3 is expected to be completed in the second quarter of 2028, and P4 is scheduled for completion in the fourth quarter of the same year. After the P2 factory is completed in the second half of next year, an additional 1,000 operational personnel will be added, with the total number of employees expected to be between 9,000 and 10,000 when all four new factories in Phase II are completed and put into production.

first_img Renzo renamed itself Renzo Finance and launched the Hyperliquid basis trading product

The re-staking protocol Renzo Protocol announced its name change to Renzo Finance and launched its first on-chain structured yield product Renzo Basis, which will go live on Hyperliquid, initially supporting BTC and HYPE. Lucas Kozinski, founder of Renzo Labs, stated that basis trading earns funding rate income by simultaneously holding a spot long and a perpetual contract short. Since the long and short positions hedge each other, asset price fluctuations do not affect the yield, and users earn the fees paid by perpetual traders every hour.Renzo stated that the product achieves automation through a triple protection mechanism, including hedge protection, yield protection, and safety buffer. Currently, the product does not use AI automation but instead conducts trading and strategy monitoring through Hyperliquid's proxy wallet (API wallet) with user authorization, without holding user funds. The relevant protection parameters can be customized by users. Renzo emphasized that its product differs from competitors such as Ethena and Bitwise's Superstate in that it is fully on-chain, self-custodied, and allows depositors to choose their own assets, trading venues, and risk parameters.Renzo Basis plans to support all assets on Hyperliquid that have both spot and perpetual markets and expand to other DeFi platforms, with the next stop being Lighter on Robinhood, where on-chain stock perpetual basis trading will be introduced.

Bitget August Transparency Report: Institutional Business Completes Multiple Product and Infrastructure Upgrades

Bitget released its transparency report for August 2026, disclosing its latest progress in the construction of a multi-asset trading ecosystem. In terms of U.S. stock tokens, taking rNVDA as an example, its daily trading volume reached $38.5 million, with over 4,200 users completing approximately 112,800 transactions, of which about 36% of the trading volume occurred outside regular U.S. trading hours, reflecting that rToken is becoming a core tool for investors to break through traditional trading time constraints and achieve 24/7 global asset allocation.On the institutional business front, Bitget launched an institutional-level CFD liquidity solution aimed at quantitative teams, proprietary trading firms, funds, brokers, and high-net-worth professional traders, supporting high-frequency quantitative trading, arbitrage between futures and spot, and automated trading scenarios such as EA.At the same time, the platform launched FCN (Fixed Coupon Notes), bringing traditional financial structured products into the tokenized U.S. stock market, becoming the first cryptocurrency exchange to combine the FCN structure with USDT settlement and U.S. stock rToken delivery. As related products and trading infrastructure continue to improve, Bitget is further strengthening its capabilities in institutional-level services, multi-asset coverage, and liquidity.In addition, third-party data shows that Bitget performs outstandingly in terms of liquidity and execution efficiency for tokenized stocks and stock perpetual contracts. In a liquidity benchmark test targeting the five stock spot markets of MSTR, SPY, QQQ, CRCL, and NVDA, DeFiLlama recorded Bitget with the lowest median bid-ask spread of 0.83 basis points and the deepest order book liquidity among all sample markets. In execution benchmark tests covering 36 stock perpetual contracts and 8 types of metal and commodity perpetual contracts, Bitget maintained a significant lead in approximately 90% of trading pairs.

first_img TSMC will start mass production using ASML's high NA EUV lithography machines in 2030

On September 8, TSMC announced that starting in 2030, it will adopt a new "high NA" extreme ultraviolet (EUV) lithography machine manufactured by ASML from the Netherlands for mass production. Both parties also stated that they will carry out industry-wide improvements on the high NA machines. ASML monopolizes the supply of EUV lithography machines used to form nanoscale ultra-fine circuits and will begin shipping high NA machines capable of drawing finer circuits starting in December 2023. Intel has already introduced high NA machines, while TSMC previously delayed mass production due to high costs and other reasons.TSMC and ASML will launch an industry-wide project to enlarge the photomask, which serves as the original circuit pattern, from the current 6-inch (approximately 15 centimeters) square to a 12-inch square, and develop high NA machines and related components corresponding to the large masks. A large mask pilot production line is planned to be established before 2031, and the high NA machines corresponding to the large masks are expected to reach a state suitable for advanced semiconductor production before 2033. Major semiconductor manufacturers and mask companies have expressed interest in participating.High NA machines can draw finer circuits, but the area that can be drawn in a single exposure is reduced to half that of traditional models, requiring multiple exposures for large chip circuits, which complicates the process and increases costs. Enlarging the photomask can expand the exposure area and reduce costs. TSMC Chairman and CEO C. C. Wei stated that the company will gather expertise from the entire industry to continuously promote technological innovation that makes advanced technology widely usable and convey its benefits.
app_icon
ChainCatcher Building the Web3 world with innovations.